Progress phase: Construction preparation Construction period: May 2011 - August 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc.
Project Profile: The project is located on the north side of the west section of Shifu Street in Beipiao City, with a construction area of ​​312,507,700 square meters. Structure: frame, number of layers: basement level, 17 floors above ground, 9 meters deep, structure: frame shear wall structure span, number of layers: 18.
The total investment of the project is RMB 32 million.
Construction Unit: Beipiaoda Real Estate Development Co., Ltd. Postal address: West Section of Zhenxing Street, Beipiao City Zip Code: 122100
Contact: Yang Yulan Telephone
inflatable tube,inflatable ring,swimming tube,swim ring,kid swimming ring, kidde swimming tube
P&D Plastic Manufacture Co., Ltd , https://www.jmpoolfloat.com